Conditions to review for your site
Heat, sun and dust
Review material weathering, coating, LED and power supply choice, heat dissipation and installation position. Coastal projects also need a separate corrosion assessment.
Arabic and English artwork
Supply approved vector files. Arabic letter connections, shapes and bilingual layout require confirmation without automatic text changes.
Power and technical documents
Share local electrical conditions and power supply position. Discuss order-specific documents; the importer checks applicable requirements for the particular product and classification.
Products to discuss
All productsYour specification review checklist
- Installation city and indoor or outdoor use
- Direct sunlight, heat and dust exposure
- Coastal location, if applicable
- Approved Arabic / English vector artwork and layout
- Mounting surface and power supply access
- Local input conditions and requested technical documents
Share what you know. Missing details can be discussed before quotation and drawing approval.
China supply. Local site work.
China-side supply can include design development, custom production, quality control and protective packing as agreed. Your local team handles site measurements, structural review, installation, electrical connections, approvals and site service. The written order sets each party’s responsibilities.
Manufacturing resourcesPacking and transport
Share the delivery city, receiving arrangements and requested document list. Packing and shipping scope are confirmed in the quotation; import requirements are checked by the importer for the specific product.
How to OrderQuestions for Saudi Arabia projects
01Can you work with Arabic artwork?
Yes, provide approved vector artwork where available. We review connections, shapes and fabrication with you. Arabic text and layout require your confirmation.
02What information is needed for outdoor signs?
Share the city, direct sun, heat and dust exposure, wall material, installation height, power supply position and local input conditions. Mention coastal exposure separately.
03What technical documents can be prepared for a project?
Ask about drawings, specifications, packing lists and wiring information before the order is confirmed. Availability depends on the sign and order; no universal certification or clearance promise is made.
Share your Saudi Arabia project brief
Prepare an email inquiry with Saudi Arabia preselected. You can change the country and product before preparing your email.
Discuss Your Saudi Signage Project



